Last Minute Details and Modifications
After producing our shop drawings for the sheet metal components of the drive bogie, we were notified by the motor team that there was a clearance issue with the new track width. The in-hub motors would be overhanging by about 5 mm on each side. To rectify this, I have been planning out an adjustment to our CAD models to remove 10-12 mm of width on the drive bogie.
Due to this being only a slight adjustment that doesn't affect all of our components, we are still moving forward on sourcing materials and preparing for production. We will be utilizing the central shop of the engineering department as well as the Makers' Space for fabrication. Below is one of the shop drawing that remains unchanged by our adjustments:
Due to this being only a slight adjustment that doesn't affect all of our components, we are still moving forward on sourcing materials and preparing for production. We will be utilizing the central shop of the engineering department as well as the Makers' Space for fabrication. Below is one of the shop drawing that remains unchanged by our adjustments:
Comments
Post a Comment