Preparation for Full Assembly and Production
Following our presentation, there were a few issues that needed to be addressed. The drawings needed small alterations based on the materials we will be using. Spacing was changed slightly due to the sheet metal being in customary units rather than the metric we designed for (0.25 in vs 3 mm). Another change was moving the lower passive wheels down slightly as to accommodate the change in track sizing.
With these changes, the designs are ready for other teams to incorporate their parts into the bogey. The files have been available for the last few weeks but now the track CAD is complete as well and ready for assembly.
With these changes, the designs are ready for other teams to incorporate their parts into the bogey. The files have been available for the last few weeks but now the track CAD is complete as well and ready for assembly.